The ceiling of the Multi-purpose room is being painted. We hope to finish the ceiling this week, have the ceiling lts. installed. Then the beginning of next week put the heating system down and the finish layer of concrete over the heating system. Then after it drys we will paint the walls. We don't want to be putting down the concrete and splattering the walls. It's a little backward than what you might think but one must be flexible!